Document Details
Name of Department/Committee : WRD 10
Document Number : WRD 10 ( 27501)
Document Title [English] : OPERATION OF RESERVOIRS GUIDELINES Second Revision of IS 7323
Document Title [Hindi] : जलाशयों का प्रचालन ― दिशानिर्देश (IS 7323 का दुसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 04-02-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 7323: 1994
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 7323: 1994


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Reservoirs-Planning, Design, Construction, Operation and maintenance
Aspects : Code of Practice
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti - Department of Water Resources, River Development and Ganga Rejuvenation
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This Indian Standard was first published in 1974. Since then considerable developments in the techniques of reservoir operations had taken place. The concept of operation of reservoir considering it as a single entity had given way to the concept of integrated operation of reservoirs. First revision of this standard was taken up in 1994 to include application of system engineering methods, such as mathematical optimization and simulation which were increasingly used for defining, evaluation and selection of reservoir operation policies.
2 This revision (second revision) has been brought out to bring the standard in the latest style and format of the Indian Standards. In addition, the following major changes have been incorporated: a) A new clause on hydropower has been incorporated to outline the operation principles of reservoirs designed for power generation, emphasizing water level management for flood and sediment control, particularly in high-flow and low-flow periods. b) Clause on flood control zone has been modified to clarify its typical range, specifying that it lies between the Full Reservoir Level (FRL) and a predefined level between the FRL and the Minimum Drawdown Level (MDDL) or Dead Storage Level (DSL).
3 c) New clauses have been incorporated to enhance real-time reservoir operation by including downstream warning system, flood simulation studies, inundation mapping, and a comprehensive Early Warning System (EWS) for disaster risk reduction, particularly in the Himalayan region. d) Clause on data collection and analysis has been modified to include various data transmission media, including GSM/GPRS communication, Radio Wave communication, and VSAT communication systems, to emphasize the diverse options available for efficient data communication.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-02-2025 04-07-2025 19-09-2025 03-02-2026 Mr. NAVDEEP YADAV 04-02-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-02-2025 -------
2 P-Draft Waived 04-02-2025 Committee decision -------