Document Details |
|||||
Name of Department/Committee : | WRD 14 | ||||
---|---|---|---|---|---|
Document Number : | WRD 14 ( 27494) | ||||
Document Title [English] : | FIRST FILLING AND EMPTYING OF PRESSURE TUNNELS GUIDELINES First Revision of IS 12633 | ||||
Document Title [Hindi] : | दाब सुरंगे भरना और खाली करना — दिशानिर्देश (IS 12633 का पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.060 | ||||
Date of Project Approval : | 31-01-2025 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Water Conductor Systems |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The pressure tunnel is a part of water conductor system and hence the filling and emptying is linked with overall planning of filling and emptying of the water conductor system. The schedule of first filling and emptying of tunnel for a project shall be prepared and discussed among design and field engineers in detail before the commencement of operation. This standard was first published in 1989, and this revision has been brought out to bring the standard in the latest style and format of the Indian Standards. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 31-01-2025 | ------- | ||
2 | P-Draft Waived | 31-01-2025 | ------- | ||
3 | WC Draft | 31-01-2025 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 31-01-2025 | WC approved by HOD |
WRDC WRD 14, | ------- |