Document Title [English] : | CONSTRUCTION OF TUNNELS CONVEYING WATER PART 1 PRECISION SURVEY AND SETTING OUT CODE OF PRACTICE First Revision of IS 5878 Part 1 | ||||
Document Title [Hindi] : | जल पहुंचाने वाली सुरंगों का निर्माण भाग 1 सटीक सर्वेक्षण और स्थापना — रीति संहिता (IS 5878 भाग 1 का पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.060 | ||||
Date of Project Approval : | 31-01-2025 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Water Conductor Systems |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This Part covers methods of precision survey for setting out the tunnel alignment. Since the tunnel excavation is normally started from many faces for expeditious completion of the work, it is essential that the excavation proceeds precisely along the pre-determined alignment. Even a slight deviation from the correct alignment, particularly in the initial stages, may lead to non-coincidence of the centre lines of the various stretches of a tunnel at the meeting points. This revision has been brought out to bring the standard in the latest style and format of the Indian Standards. In addition, Figure 1 has been revised for better clarity. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 31-01-2025 | ------- | ||
2 | P-Draft Waived | 31-01-2025 | Committee decided for Wide Circulation | ------- | |
3 | WC Draft | 31-01-2025 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 31-01-2025 | WC approved by HOD |
WRDC | ------- |