Document Details |
|||||
Name of Department/Committee : | WRD 23 | ||||
---|---|---|---|---|---|
Document Number : | WRD 23 ( 27477) | ||||
Document Title [English] : | METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 10 FORMWORK | ||||
Document Title [Hindi] : | नदी घाटी परियोजनाओं में कार्य मापन की पद्धति (बाँध और संबंध संरचनाएं) भाग 10 फॉर्मवर्क | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 21-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | In measurement of quantities, in construction of river valley projects a large diversity of methods exists at present according to local practices. This lack of uniformity creates complication regarding measurement. This standard is intended to provide a uniform basis for measurement of formwork in the construction of river valley projects. The provisions contained in this standard shall generally have precedence over the provisions in IS 1200 (Part 5) : 1982. However, the provisions of both the standards may be considered complimentary and supplementary to each other. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-08-2024 | ------- | ||
2 | P-Draft Waived | 29-01-2025 | ------- | ||
3 | WC Draft | 29-01-2025 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 31-01-2025 | WC approved by HOD |
WRDC | ------- |