Document Details
Name of Department/Committee : WRD 23
Document Number : WRD 23 ( 27477)
Document Title [English] : METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 10 FORMWORK
Document Title [Hindi] : नदी घाटी परियोजनाओं में कार्य मापन की पद्धति (बाँध और संबंध संरचनाएं) भाग 10 फॉर्मवर्क
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 21-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9401 : Part 10: 1990
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 9401 : Part 10: 1990


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti - Department of Water Resources, River Development and Ganga Rejuvenation
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 In measurement of quantities, in construction of river valley projects a large diversity of methods exists at present according to local practices. This lack of uniformity creates complication regarding measurement. This standard is intended to provide a uniform basis for measurement of formwork in the construction of river valley projects. The provisions contained in this standard shall generally have precedence over the provisions in IS 1200 (Part 5) : 1982. However, the provisions of both the standards may be considered complimentary and supplementary to each other.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-01-2025 29-06-2025 13-09-2025 28-01-2026 Mr. Vaibhav Yadav 29-01-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-08-2024 -------
2 P-Draft Waived 29-01-2025 -------
3 WC Draft 29-01-2025 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 31-01-2025 WC approved by HOD
WRDC   -------