Document Details
Name of Department/Committee : WRD 23
Document Number : WRD 23 ( 27473)
Document Title [English] : METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 1 EXCAVATION FOR FOUNDATION
Document Title [Hindi] : नदी घाटी परियोजनाओं में कार्य मापन की पद्धति (बाँध और संबंधित संरचनाएं) भाग 1 नींव उत्खनन
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 21-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9401 : Part 1: 1999
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 9401 : Part 1: 1999


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti - Department of Water Resources, River Development and Ganga Rejuvenation
  • Ministry of Jal Shakti - Department of Water Resources, River Development and Ganga Rejuvenation
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard has been formulated in various parts, covering each type of work separately and Part 1 is intended to provide a uniform basis for measurement of excavation for foundation in the construction of river valley projects. This standard was first published in 1982. The revision has been taken up in the light of experience gained during its usage and to align it with current field practices. A number of standards have been published for measurement of different works undertaken in River Valley Projects and this revision is also intended to harmonize the earlier version with those parts which have been published since 1982.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-01-2025 29-06-2025 13-09-2025 28-01-2026 Mr. Vaibhav Yadav 29-01-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-08-2024 -------
2 WC Draft 29-01-2025 Duration : 60 Days
Submitted for HOD approval
-------
3 WC Draft 31-01-2025 WC rejected by HOD
Remarks: resubmit with minor corrections
-------
4 WC Draft 03-02-2025 Duration : 60 Days
Submitted for HOD approval
-------
5 WC Draft 03-02-2025 WC approved by HOD
WRDC   -------