Document Details |
|||||
Name of Department/Committee : | MED 01 | ||||
---|---|---|---|---|---|
Document Number : | MED 01 ( 27465) | ||||
Document Title [English] : | ACCEPTANCE TESTS ON INDUSTRIAL BOILERS CODE OF PRACTICE | ||||
Document Title [Hindi] : | औद्योगिक बॉयलरों के स्वीकार्यता परीक्षण — रीति संहिता | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 23.020.30; 27.060.30 | ||||
Date of Project Approval : | 27-01-2025 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Industrial and other gases, Gas Cylinders and Fittings, boilers and pressure vessels |
Sub Sub Group : | Boilers & Unfired pressure vessel |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The purpose of this code is to establish procedures for conducting acceptance tests on industrial steam generating units and hot water boilers of the water tube type with capabilities larger than 25 tonnes F&A 100 °C of steam per hour, generally as envisaged in Fig. 1. The standard applies to units burning solid fuels fired by hand or by mechanical stokers or pulverized fuel firing equipment as well as liquid or gaseous fuel. It does not apply to packaged boilers which are, 40 a large extent, shop assembled. It also does not apply to dual fired or waste heat units which require a more specialized form of dry and wet gas heat loss measurement. The code lays the procedure to determine: a) Gross thermal efficiency; b) Rating of the units; and c) Other relating operating parameters such as steam temperature and control range. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-01-2025 | ------- | ||
2 | P-Draft Waived | 27-01-2025 | The Committee decided to WC | ------- | |
3 | WC Draft | 27-01-2025 | Duration : 30 Days Submitted for HOD approval Remarks : HMED may kindly approve |
------- | |
4 | WC Draft | 27-01-2025 | WC approved by HOD |
MEDC MED 01, | ------- |