Document Details
Name of Department/Committee : MED 01
Document Number : MED 01 ( 27465)
Document Title [English] : ACCEPTANCE TESTS ON INDUSTRIAL BOILERS CODE OF PRACTICE
Document Title [Hindi] : औद्योगिक बॉयलरों के स्वीकार्यता परीक्षण — रीति संहिता
Document Type : Revision
Language : English
Priority : 3
ICS Code : 23.020.30; 27.060.30
Date of Project Approval : 27-01-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13980: 1995
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13980: 1995


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Industrial and other gases, Gas Cylinders and Fittings, boilers and pressure vessels
Sub Sub Group : Boilers & Unfired pressure vessel
Aspects : Code of Practice
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Consumer Affairs, Food and Public Distribution - Department of Food and Public Distribution
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The purpose of this code is to establish procedures for conducting acceptance tests on industrial steam generating units and hot water boilers of the water tube type with capabilities larger than 25 tonnes F&A 100 °C of steam per hour, generally as envisaged in Fig. 1. The standard applies to units burning solid fuels fired by hand or by mechanical stokers or pulverized fuel firing equipment as well as liquid or gaseous fuel. It does not apply to packaged boilers which are, 40 a large extent, shop assembled. It also does not apply to dual fired or waste heat units which require a more specialized form of dry and wet gas heat loss measurement. The code lays the procedure to determine: a) Gross thermal efficiency; b) Rating of the units; and c) Other relating operating parameters such as steam temperature and control range.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 27-01-2025 27-06-2025 11-09-2025 26-01-2026 KHUSHBU JYOTSNA KINDO 27-01-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-01-2025 -------
2 P-Draft Waived 27-01-2025 The Committee decided to WC -------
3 WC Draft 27-01-2025 Duration : 30 Days
Submitted for HOD approval
Remarks : HMED may kindly approve
-------
4 WC Draft 27-01-2025 WC approved by HOD
MEDC  MED 01, -------