Document Details
Name of Department/Committee : CHD 20
Document Number : CHD 20 ( 26399)
Document Title [English] : METHODS OF SAMPLING AND TEST FOR PAINTS VARNISHES AND RELATED PRODUCTS Part 3 Tests on Paint Film Formation Sec 2 Determination of film thickness
Document Title [Hindi] : रंग रोगन, वार्निश और संबंधित उत्पादों के नमूनाकरण और परीक्षण पद्धतियाँ भाग 3 रंग रोगन के निर्मित फिल्म पर परीक्षण अनुभाग 2 फिल्म की मोटाई का निर्धारण
Document Type : Revision
Language : English
Priority : 2
ICS Code : 87.040
Date of Project Approval : 07-03-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 101 : Part 3 : Sec 2: 1989
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 101 : Part 3 : Sec 2: 1989


Classification Details
Group : Building Materials including Paints
Sub Group : Pigments, Paints and Accessories
Sub Sub Group : Brushes for painting
Aspects : Methods of tests
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 2808 : 2019
Organization Type: ISO

Sl.No. Synosis Points
1 This document describes methods for measuring the film thickness of paints and related materials. The thickness of paint, or film thickness, is crucial for protection against corrosion, durability, and maintaining a uniform appearance. Adequate thickness ensures resistance to environmental damage, mechanical wear, and enhances the longevity and aesthetic quality of the painted surface.
2 In this fourth revision, the Sectional Committee, recognizing the significance of globally uniform practices, has decided to adopt ISO 2808 : 2019 as an Indian Standard in dual number.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-08-2024 22-12-2024 22-01-2025 22-05-2025 Mr. Pushpendra Kumar 22-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-03-2024 -------
2 P-Draft Waived 22-08-2024 -------
3 WC Draft 22-08-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : The sectional committee in its 28th Meeting CHD 20 has decided to send the document into wide circulation for a period of two months
-------
4 WC Draft 30-08-2024 WC rejected by HOD
Remarks: Please recheck the Foreword.
-------
5 WC Draft 02-09-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : As suggested suitable corrections have been done
-------
6 WC Draft 04-09-2024 WC rejected by HOD
Remarks: Please review the Foreword.
-------
7 WC Draft 04-09-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : As suggested suitable corrections have been done
-------
8 WC Draft 06-09-2024 WC approved by HOD
CHDC  CHD 21, -------