Document Details |
|||||
Name of Department/Committee : | ETD 40 | ||||
---|---|---|---|---|---|
Document Number : | ETD 40 ( 26321) | ||||
Document Title [English] : | Voltage sourced converter VSC valves for high - Voltage direct current HVDC power transmission - Electrical testing | ||||
Document Title [Hindi] : | उच्च-वोल्टेज प्रत्यक्ष धारा (एचवीडीसी) पावर ट्रांसमिशन के लिए वोल्टेज सोर्स कनवर्टर (वीएससी) वाल्व - विद्युत परीक्षण | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.200, 29.240.99 | ||||
Date of Project Approval : | 07-06-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Power system control and communication |
Sub Sub Group : | HVDC Power Systems |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 62501:2024 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This Indian Standard applies to self-commutated converter valves, for use in a threephase bridge voltage sourced converter (VSC) for high voltage DC power transmission or as part of a back-to-back link, and to dynamic braking valves. It is restricted to electrical type and production tests |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 07-06-2024 | ------- | ||
2 | P-Draft | 07-08-2024 | Covering letter generated | ------- | |
3 | P-Draft | 07-08-2024 | Duration : 14 Days Remarks : Kindly note that the enclosed IEC standards are priced publication and copyright protected It is to be used for the purpose of standard formulation purpose onlyrn |
ETD 40, | ------- |
4 | Skipped to W-Draft | 05-11-2024 | Stage-Changed | ------- | |
5 | WC Draft | 05-11-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 05-11-2024 | WC approved by HOD |
ETDC | ------- |