Document Details |
|||||
Name of Department/Committee : | ETD 07 | ||||
---|---|---|---|---|---|
Document Number : | ETD 07 ( 26318) | ||||
Document Title [English] : | Low-voltage switchgear and controlgear assemblies Part 5: Assemblies for power distribution in public networks First Revision | ||||
Document Title [Hindi] : | Low-voltage switchgear and controlgear assemblies – Part 5: Assemblies for power distribution in public networks (First Revision) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 29.130.20 | ||||
Date of Project Approval : | 06-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Switchgear, Metering and Accessories |
Sub Sub Group : | Circuit breakers, switches and disconnectors |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 61439-5: 2023 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of IEC 61439 defines the specific requirements for public electricity network distribution assemblies (PENDAs). PENDAs have the following criteria: – used for the distribution of electrical energy in three phase systems for which the rated voltage does not exceed 1 000 V a.c. (see Figure 101 for a typical distribution network); – stationary; – open ASSEMBLIES are not covered by this standard; – suitable for installation in places where only skilled persons have access for their use, however, outdoor types may be installed in situations that are accessible to ordinary persons; – for indoor or outdoor use. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 06-08-2024 | ------- | ||
2 | P-Draft | 07-08-2024 | Covering letter generated | ------- | |
3 | P-Draft | 07-08-2024 | Duration : 30 Days | ETD 7, | ------- |
4 | Skipped to W-Draft | 28-11-2024 | Stage-Changed | ------- | |
5 | WC Draft | 28-11-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Since no comments were received during the P draft stage the Chairman of the ETD 07 Sectional Committee approved the documents for wide circulation for 60 days via email on 26-Nov-2024 |
------- | |
6 | WC Draft | 29-11-2024 | WC approved by HOD |
ETDC | ------- |