Document Details
Name of Department/Committee : ETD 07
Document Number : ETD 07 ( 26317)
Document Title [English] : Low-Voltage Switchgear and Controlgear Assemblies Part 4: Particular requirements for assemblies for construction sites ACS First Revision
Document Title [Hindi] : Low-Voltage Switchgear and Controlgear Assemblies – Part 4: Particular requirements for assemblies for construction sites (ACS) (First Revision)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 29.130.20
Date of Project Approval : 06-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61439 : Part 4: 2012
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61439 : Part 4: 2012


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Circuit breakers, switches and disconnectors
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61439-4: 2024
Organization Type: IEC

Sl.No. Synosis Points
1 This part of 61439 defines the specific requirements of ACS as follows: – ASSEMBLIES for which the rated voltage does not exceed 1 000 V in case of a.c. or 1 500 V in case of d.c.; – ASSEMBLIES where the nominal primary voltage and the nominal secondary voltage of transformers incorporated in ACS are within the limits specified above; – ASSEMBLIES intended for use on construction sites, both indoors and outdoors, i.e. temporary places of work to which the public do not generally have access and where building construction, installation, repairs, alteration or demolition of property (buildings) or civil engineering (public works) or excavation or any other similar operations are carried out; – transportable (semi-fixed) or mobile ASSEMBLIES with enclosure.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-08-2024 06-01-2025 21-03-2025 05-08-2025 Mr. ASHOK KUMAR 06-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-08-2024 -------
2 P-Draft 07-08-2024 Covering letter generated -------
3 P-Draft 07-08-2024 Duration : 30 Days ETD 7, -------
4 Skipped to W-Draft 28-11-2024 Stage-Changed -------
5 WC Draft 28-11-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Since no comments were received during the P draft stage the Chairman of the ETD 07 Sectional Committee approved the documents for wide circulation for 60 days via email on 26-Nov-2024
-------
6 WC Draft 29-11-2024 WC approved by HOD
ETDC   -------