Document Details
Name of Department/Committee : ETD 07
Document Number : ETD 07 ( 26312)
Document Title [English] : In-cable control and protection device IC-CPD for mode 2 charging of electric road vehicles (First Revision)
Document Title [Hindi] : In-cable control and protection device (IC-CPD) for mode 2 charging of electric road vehicles (First Revision)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 29.120.50
Date of Project Approval : 06-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 17120 : 2019
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 17120 : 2019


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Circuit breakers, switches and disconnectors
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 62752:2024
Organization Type: IEC

Sl.No. Synosis Points
1 This Standard applies to in-cable control and protection devices (IC-CPDs) for mode 2 charging of electric road vehicles, hereafter referred to as IC-CPD including control and safety functions.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-08-2024 06-01-2025 21-03-2025 05-08-2025 Mr. Ashok Kumar 06-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-08-2024 -------
2 P-Draft 07-08-2024 Covering letter generated -------
3 P-Draft 07-08-2024 Duration : 30 Days ETD 7, -------
4 Skipped to W-Draft 28-11-2024 Stage-Changed -------
5 WC Draft 28-11-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Since no comments were received during the P draft stage the Chairman of the ETD 07 Sectional Committee approved the documents for wide circulation for 60 days via email on 26-Nov-2024
-------
6 WC Draft 29-11-2024 WC approved by HOD