Document Details |
|||||
Name of Department/Committee : | ETD 35 | ||||
---|---|---|---|---|---|
Document Number : | ETD 35 ( 26305) | ||||
Document Title [English] : | Time Relays for Industrial and Residential Use | ||||
Document Title [Hindi] : | औद्योगिक एवं आवासीय प्रयोग हेतु रिले | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 29.120.70 | ||||
Date of Project Approval : | 19-06-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Switchgear, Metering and Accessories |
Sub Sub Group : | Circuit breakers, switches and disconnectors |
Aspects : | Product Specification |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 61812-1:2023 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of the IEC 61812 applies to time relays for industrial applications (e.g. control, automation, signal and industrial equipment). It also applies to time relays for automatic electrical controls for use in, on, or in association with equipment for residential and similar use. The term “relay” as used in this standard comprises all types of relays with specified time functions, other than measuring relays. NOTE Depending on the field of application of these relays (for example automatic electrical controls for household and similar use, switches for household and similar fixed electrical installations), further standards may be applicable, for example IEC 60730-2-7 or IEC 60669-2-3. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 19-06-2024 | ------- | ||
2 | P-Draft | 05-08-2024 | Covering letter generated | ------- | |
3 | P-Draft | 05-08-2024 | Duration : 45 Days | ETD 35, | ------- |
4 | Skipped to W-Draft | 20-01-2025 | Stage-Changed | ------- | |
5 | WC Draft | 20-01-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 21-01-2025 | WC approved by HOD |
ETDC | ------- |