Name of Department/Committee : ETD 35
Document Number : ETD 35 ( 26305)
Document Title [English] : Time Relays for Industrial and Residential Use
Document Title [Hindi] : औद्योगिक एवं आवासीय प्रयोग हेतु रिले
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 29.120.70
Date of Project Approval : 19-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61812 : Part 1: 2011
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Circuit breakers, switches and disconnectors
Aspects : Product Specification
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 61812-1:2023
Organization Type: IEC

Sl.No. Synosis Points
1 This part of the IEC 61812 applies to time relays for industrial applications (e.g. control, automation, signal and industrial equipment). It also applies to time relays for automatic electrical controls for use in, on, or in association with equipment for residential and similar use. The term “relay” as used in this standard comprises all types of relays with specified time functions, other than measuring relays. NOTE Depending on the field of application of these relays (for example automatic electrical controls for household and similar use, switches for household and similar fixed electrical installations), further standards may be applicable, for example IEC 60730-2-7 or IEC 60669-2-3.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 05-08-2024 05-01-2025 20-03-2025 04-08-2025 Mr. TUSHAR SHARMA 05-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 19-06-2024 -------
2 P-Draft 05-08-2024 Covering letter generated -------
3 P-Draft 05-08-2024 Duration : 45 Days ETD 35, -------
4 Skipped to W-Draft 20-01-2025 Stage-Changed -------
5 WC Draft 20-01-2025 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 21-01-2025 WC approved by HOD