Document Details |
|||||
Name of Department/Committee : | PGD 40 | ||||
---|---|---|---|---|---|
Document Number : | PGD 40 ( 26303) | ||||
Document Title [English] : | Belt drives Pulleys and V-ribbed belts for industrial applications PH PJ PK PL and PM profiles: Dimensions | ||||
Document Title [Hindi] : | बेल्ट चालन — अनुप्रयोग उद्योग हेतु घिरनियाँ व वी-उभरी धारीदार पट्टे — पी एच,पी जे, पी के, पी एल और पी एम प्रोफाइल : आयाम | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 21.220.10 | ||||
Date of Project Approval : | 05-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Transmission equipments and bearings |
Sub Sub Group : | Transmission, conveyer and elevator Belting |
Aspects : | Dimensions |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | Belt drives — Pulleys and V-ribbed belts for industrial |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 9982 : 2021 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This Standard specifies the principal dimensional characteristics of V-ribbed pulley groove profiles, together with the corresponding endless V-ribbed belts, of PH, PJ, PK, PL and PM profiles which are used for general industrial applications except elastic belts. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 05-08-2024 | ------- | ||
2 | P-Draft Waived | 05-08-2024 | ------- | ||
3 | WC Draft | 07-08-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 09-08-2024 | WC rejected by HOD Remarks: Please correct as discussed. |
------- | |
5 | WC Draft | 09-08-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 09-08-2024 | WC rejected by HOD Remarks: Please correct as discussed. |
------- | |
7 | WC Draft | 09-08-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 09-08-2024 | WC approved by HOD |
PGDC PGD 40, | ------- |