Document Details
Name of Department/Committee : MTD 24
Document Number : MTD 24 ( 26292)
Document Title [English] : Resistance to inter - Granular corrosion of austenitic stainless steels - Method for determination - Part 1 : corrosion test in nitric acid medium by measurement of loss in mass Huey Test
Document Title [Hindi] : ऑस्टेनाइटीक स्टेनलेस इस्पात की अंतकणिका संक्षारण के प्रतिरोध की निर्धारण विधि भाग १ द्रव्यमान में हानि के मापन द्वारा नाइट्रिक एसिड माध्यम में संक्षारण परीक्षण ( हुए परिक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 77.060
Date of Project Approval : 01-05-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 10461 : Part 1: 1994
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 10461 : Part 1: 1994


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Anti-corrosion products
Sub Sub Group : Test Methods on corrosion protection
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
Degree of Equivalence : Not Equivalent
Identical/Equivalent Standards : ISO 3651
Organization Type: ISO

Sl.No. Synosis Points
1 Intergranular corrosion denotes deterioration of metals by means of preferential attacking of the grain boundaries. For austenitic stainless steels, which may be subject to such as attack when they are kept at a temperature between about 430 ºC to 820 ºC, it is associated with the precipitation of chromium rich carbides or intermetallic compounds, such as sigma phase at grain boundaries. The heat cycle, which may provoke sensitization to intergranular corrosion, may occur during hot-forming process like forging and rolling, as the result of incorrect solution treatment or during a welding operation.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 01-08-2024 01-01-2025 16-03-2025 31-07-2025 Mr. HAWELIKAR DUSHYANT SATYAPREM 01-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-05-2024 -------
2 P-Draft 02-08-2024 Covering letter generated -------
3 P-Draft 02-08-2024 Duration : 21 Days
Remarks : Final P-Draft has been prepared in consultation with Dr Ningshen - IGCAR and Dr Supratik - BARC as decided in the last committee meeting
MTD 24, -------
4 Skipped to W-Draft 17-10-2024 Stage-Changed -------
5 WC Draft 21-10-2024 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 21-10-2024 WC approved by HOD
MTDC   -------