Document Details
Name of Department/Committee : LITD 04
Document Number : LITD 04 ( 26264)
Document Title [English] : Measurement of Photosensitive Devices Part 3: Methods of Measurement of Photoconductive Cells for use in the Visible Spectrum (First Revision)
Document Title [Hindi] : प्रकाश संवेदनशील उपकरणों का मापन भाग 3: दृश्य स्पेक्ट्रम में उपयोग के लिए फोटोकंडक्टिव कोशिकाओं की मापन विधियाँ (पहला परिशोधन)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS.No. 31.260
Date of Project Approval : 01-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 7146 : Part 3: 1974
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 7146 : Part 3: 1974


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Testing procedures for electromechanical components
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60306-3:1970
Organization Type: IEC

Sl.No. Synosis Points
1 IEC 60306-3:1970 outlines the requirements and specifications for the design and performance of high-voltage electrical equipment, particularly focusing on the insulation coordination for such equipment. This standard is intended to ensure the reliable operation and safety of electrical systems by establishing guidelines for the selection and application of insulation materials, as well as the coordination of insulation levels to protect against electrical stresses. It provides criteria for insulation strength, dielectric properties, and the interaction of different insulation components within electrical installations.
2 This standard applies to equipment operating at voltages above 1 kV and serves as a reference for manufacturers, engineers, and technicians involved in the design, testing, and maintenance of high-voltage electrical systems.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 30-07-2024 30-12-2024 17-03-2025 01-08-2025 DEVANSH DEOLEKAR 30-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-06-2024 -------
2 P-Draft Waived 30-07-2024 The committee decided to issue wide circulation for a period of two months. -------
3 WC Draft 01-08-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The committee decided to issue wide circulation for two months All committee members are requested to provide their comments on or before the due date 30 Sept 2024
-------
4 WC Draft 02-08-2024 WC approved by HOD
LITDC   -------