Document Details |
|||||
Name of Department/Committee : | ETD 31 | ||||
---|---|---|---|---|---|
Document Number : | ETD 31 ( 26257) | ||||
Document Title [English] : | Semiconductor converters - General requirements and line commutated converters - Part 1-1: Specification of basic requirements | ||||
Document Title [Hindi] : | -- | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.200 , 29.045 | ||||
Date of Project Approval : | 18-06-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Power system control and communication |
Sub Sub Group : | Power System Control and Communications |
Aspects : | Safety Standard |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 60146-1-1:2024 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of standard specifies the requirements for the performance of all semiconductor power converters and semiconductor power switches using controllable and/or non-controllable electronic valve devices. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 18-06-2024 | ------- | ||
2 | P-Draft | 30-07-2024 | Covering letter generated | ------- | |
3 | P-Draft | 30-07-2024 | Duration : 14 Days | ETD 31, | ------- |
4 | Skipped to W-Draft | 05-11-2024 | Stage-Changed | ------- | |
5 | WC Draft | 05-11-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 11-11-2024 | WC approved by HOD |
ETDC | ------- |
7 | WC Draft | 11-11-2024 | WC approved by HOD |
ETDC | ------- |