Document Details
Name of Department/Committee : CHD 36
Document Number : CHD 36 ( 26239)
Document Title [English] : Methods of Sampling and Test Physical and Chemical for Water and Wastewater Part 85 Detection of selected congeners of polychlorinated dibenzo-p-dioxins and polychlorinated biphenyls Method using a flow immunosensor technique
Document Title [Hindi] : जल एवं अपशिष्ट जल के नमूने लेने तथा परीक्षण (भौतिक एवं रसायन) की पद्धतियाँ भाग 85 पॉलीक्लोराइनेटेड डिबेंजो-पी-डाइऑक्सिन और पॉलीक्लोराइनेटेड बाइफिनाइल के चयनित संबंधी का प्रवाह इम्यूनोसेंसर तकनीक विधि द्वारा पता लगाना
Document Type : New
Language : English
Priority : 2
ICS Code : 13.060.50
Date of Project Approval : 25-07-2024
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Methods of Sampling and test of water and wastewater
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title : Detection of selected congeners of polychlorinated dibenzo-p-dioxins and polychlorinated biphenyls —
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
  • CLEAN WATER AND SANITATION
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : 23256:2023
Organization Type: ISO

Sl.No. Synosis Points
1 This standard specifies methods and principles for detection of selected congeners of polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated biphenyls (PCBs) in water and wastewater using a flow immunosensor. The flow immunosensor utilizes antibodies specific to 2,3,7,8-tetrachlorodibenzop-dioxin (2,3,7,8-TCDD) and 3,3’,4,4’,5pentachlorobiphenyl (3,3’,4,4’,5-PeCB), which have the highest toxic equivalent factor (TEF) value among the congeners of each of PCDDs and PCBs. The method is applicable to timely monitoring of selected congeners of 2,3,7,8-TCDD and 3,3’,4,4’,5-PeCB in water and wastewater to prioritize those for subsequent confirmatory determination.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 26-07-2024 26-11-2024 26-12-2024 26-04-2025 Ms. SHUBHANJALI UMRAO 26-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 25-07-2024 -------
2 P-Draft 01-08-2024 Covering letter generated -------
3 P-Draft 01-08-2024 Duration : 21 Days
Remarks : The Committee decided to circulate it as P-draft
CHD 36, -------
4 Skipped to W-Draft 26-09-2024 Stage-Changed -------
5 WC Draft 26-09-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The Water Quality Sectional Committee CHD 36 in its 21st meting held on 18092024 decided to issue i ino wide circulation
-------
6 WC Draft 04-10-2024 WC rejected by HOD
Remarks: Please discuss regarding the title and IS no
-------
7 WC Draft 18-10-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Correction as suggested have been incorporated
-------
8 WC Draft 21-10-2024 WC approved by HOD
CHDC   -------