Document Details
Name of Department/Committee : ETD 23
Document Number : ETD 23 ( 26233)
Document Title [English] : Self-Ballasted LED Lamps for General Lighting Services Part 2 Performance Requirements Second Revision
Document Title [Hindi] : सामान्य प्रकाश सेवाओ के लिए स्वत: जलने वाले एल ई डी लैम्प भाग 2 कार्यकरिता अपेक्षाएं (दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : ICS 29.140.99
Date of Project Approval : 22-07-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 16102 : Part 2: 2017
Standards to be Superseded :


Classification Details
Group : Electrical Appliances and Accessories
Sub Group : Electrical Lamps and Wiring Accessories
Sub Sub Group : Lamps & accessories
Aspects : Product Specification
Risk : Medium
Certification : Mandatory Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Modified/Technically Equivalent
Identical/Equivalent Standards : IEC 62612: 2018
Organization Type: IEC

Sl.No. Synosis Points
1 This Standard specifies the performance requirements, together with the test methods and conditions, required to show compliance of LED lamps with integral means for stable operation, intended for domestic and similar general lighting purposes, having: - a rated power up to 60 W; - a rated voltage of > 50 V a.c. up to 250 V a.c.; - a lamp cap as listed in IEC 62560.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-07-2024 25-11-2024 25-12-2024 25-04-2025 NEHA AGARWAL 25-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-07-2024 -------
2 P-Draft 25-07-2024 Covering letter generated -------
3 P-Draft 25-07-2024 Duration : 30 Days ETD 23, -------
4 Skipped to W-Draft 10-01-2025 Stage-Changed -------
5 WC Draft 10-01-2025 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 15-01-2025 WC approved by HOD
ETDC   -------