Document Details
Name of Department/Committee : ETD 23
Document Number : ETD 23 ( 26232)
Document Title [English] : Self-Ballasted LED Lamps for General Lighting Services Part 1 Safety Requirements (First Revision)
Document Title [Hindi] : सामान्य प्रकाश सेवाओ के लिए स्वत: जलने वाले एल ई डी लैम्प भाग 1 सुरक्षा अपेक्षाएं ( पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : ICS 29.140.99
Date of Project Approval : 22-07-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 16102 : Part 1: 2012
Standards to be Superseded :


Classification Details
Group : Electrical Appliances and Accessories
Sub Group : Lamps, Luminaire and Accessories
Sub Sub Group : Luminaires & lighting
Aspects : Product Specification
Risk : Medium
Certification : Mandatory Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Modified/Technically Equivalent
Identical/Equivalent Standards : IEC 62560: 2015
Organization Type: IEC

Sl.No. Synosis Points
1 This Standard specifies the safety and interchangeability requirements, together with the test methods and conditions required to show compliance of LED-lamps with integrated means for stable operation (self-ballasted LED-lamps), intended for domestic and similar general lighting purposes, having: - a rated wattage up to 60 W; - a rated voltage of > 50 V up to 250 V; - caps according to Table 1. The contents of the corrigendum 1 of January 2012, the corrigendum 2 of July 2015 and the corrigendum of Amendment 1 of June 2015 have been included in this copy. This consolidated version consists of the first edition (2011) and its amendment 1 (2015).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-07-2024 25-11-2024 25-12-2024 25-04-2025 NEHA AGARWAL 25-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-07-2024 -------
2 P-Draft 25-07-2024 Covering letter generated -------
3 P-Draft 25-07-2024 Duration : 30 Days ETD 23, -------
4 Skipped to W-Draft 02-01-2025 Stage-Changed -------
5 WC Draft 02-01-2025 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 07-01-2025 WC rejected by HOD
Remarks: Please make corrections in the national foreword, as discussed.
-------
7 WC Draft 10-01-2025 Duration : 30 Days
Submitted for HOD approval
-------
8 WC Draft 15-01-2025 WC approved by HOD