Name of Department/Committee : | ETD 23 | ||||
---|---|---|---|---|---|
Document Number : | ETD 23 ( 26232) | ||||
Document Title [English] : | Self-Ballasted LED Lamps for General Lighting Services Part 1 Safety Requirements (First Revision) | ||||
Document Title [Hindi] : | सामान्य प्रकाश सेवाओ के लिए स्वत: जलने वाले एल ई डी लैम्प भाग 1 सुरक्षा अपेक्षाएं ( पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | ICS 29.140.99 | ||||
Date of Project Approval : | 22-07-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Appliances and Accessories |
Sub Group : | Lamps, Luminaire and Accessories |
Sub Sub Group : | Luminaires & lighting |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Mandatory Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Modified/Technically Equivalent |
Identical/Equivalent Standards : | IEC 62560: 2015 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This Standard specifies the safety and interchangeability requirements, together with the test methods and conditions required to show compliance of LED-lamps with integrated means for stable operation (self-ballasted LED-lamps), intended for domestic and similar general lighting purposes, having: - a rated wattage up to 60 W; - a rated voltage of > 50 V up to 250 V; - caps according to Table 1. The contents of the corrigendum 1 of January 2012, the corrigendum 2 of July 2015 and the corrigendum of Amendment 1 of June 2015 have been included in this copy. This consolidated version consists of the first edition (2011) and its amendment 1 (2015). |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-07-2024 | ------- | ||
2 | P-Draft | 25-07-2024 | Covering letter generated | ------- | |
3 | P-Draft | 25-07-2024 | Duration : 30 Days | ETD 23, | ------- |
4 | Skipped to W-Draft | 02-01-2025 | Stage-Changed | ------- | |
5 | WC Draft | 02-01-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 07-01-2025 | WC rejected by HOD Remarks: Please make corrections in the national foreword, as discussed. |
------- | |
7 | WC Draft | 10-01-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 15-01-2025 | WC approved by HOD |
ETDC | ------- |