Document Details |
|||||
Name of Department/Committee : | CED 46 | ||||
---|---|---|---|---|---|
Document Number : | CED 46 ( 26227) | ||||
Document Title [English] : | National Building Code of India Part 8 Building Services Section 5 Installation of Lifts Escalators and Moving Walks 5B Escalators and Moving Walks | ||||
Document Title [Hindi] : | भारत की राष्ट्रीय भवन निर्माण संहिता भाग 8 भवन निर्माण सेवाएँ अनुभाग 5 लिफ्ट, स्वचालित सीढियाँ तथा चलपथ की स्थापना 5B स्वचालित सीढियाँ तथा चलपथ | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 01.120: 91.040.01 | ||||
Date of Project Approval : | 16-04-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | NBC of India |
Aspects : | Others |
Risk : | High |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The significant modifications made in this revision of the subsection include amongst others, the following key changes: a) The terminology has been updated and includes maintenance aspects and electrical safety system. b) The requirements of power supply including protection devices have been elaborated, in 6.5.3. c) Fire protection requirements for the installations have been elaborated, in 7. d) Technical requirements for outdoor escalators/moving walks and semi- outdoor escalators/moving walks have been included in 9.2 and 9.3. e) Inspection check list has been reviewed and revised, under 14.6.2. f) Annex A on typical escalator site checklist/inspection list has been considerably revised. g) Annex B on typical check list for functional tests on safety switches and devices has been revised. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 16-04-2024 | ------- | ||
2 | P-Draft | 05-08-2024 | Covering letter generated | ------- | |
3 | P-Draft | 05-08-2024 | Duration : 21 Days Remarks : Comments are solicited from CED 46 and ALL its Panels on this Chapter of NBC on Revision of 5B under Part 8 |
CED 46, CED 46 : P2, CED 46 : P1, CED 46 : P3, CED 46 : P5, CED 46 : P4, CED 46 : P6, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P11, CED 46 : P16, CED 46 : P22, CED 46 : P7, | ------- |
4 | Skipped to W-Draft | 13-03-2025 | Stage-Changed | ------- | |
5 | WC Draft | 13-03-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 13-03-2025 | WC rejected by HOD Remarks: rejected |
------- | |
7 | WC Draft | 13-03-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 14-03-2025 | WC approved by HOD |
CEDC CED 46, ETD 25, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, | ------- |