Document Details |
|||||
Name of Department/Committee : | CED 44 | ||||
---|---|---|---|---|---|
Document Number : | CED 44 ( 26225) | ||||
Document Title [English] : | Method of Measurement of Building and Civil Engineering Works Part 2 Concrete Works | ||||
Document Title [Hindi] : | भवन की माप की विधि एवं सिविल इंजीनियरिंग कार्य भाग 2 कंक्रीट कार्य | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 17.020; 91.040.01; 93.010 | ||||
Date of Project Approval : | 16-07-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | Methods of Measurement of building and civil engineering works and Handbook |
Aspects : | Others |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The provision for separately measuring the work where underground utilities exist, have been included | |
2 | The measurement of pre tensioning cables/strands have been modified |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 16-07-2024 | ------- | ||
2 | P-Draft | 25-07-2024 | Covering letter generated | ------- | |
3 | P-Draft | 25-07-2024 | Duration : 21 Days | CED 44, CED 02, | ------- |
4 | Skipped to W-Draft | 07-10-2024 | Stage-Changed | ------- | |
5 | WC Draft | 07-10-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 07-10-2024 | WC approved by HOD |
CEDC CED 02, | ------- |