Name of Department/Committee : | ETD 01 | ||||
---|---|---|---|---|---|
Document Number : | ETD 01 ( 26210) | ||||
Document Title [English] : | VOLTAGE BANDS FOR ELECTRICAL INSTALLATIONS INCLUDING PREFERRED VOLTAGE AND FREQUENCY | ||||
Document Title [Hindi] : | अधिमान्य वोल्टेज अवं आवृत्ति सहित विद्युत अधिष्ठापनो के लिए वोल्टेज बैंड | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.020 | ||||
Date of Project Approval : | 24-07-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Electrical installations and general electricals |
Sub Sub Group : | Preferred ratings in electrotechnology |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | VOLTAGE BANDS FOR ELECTRICAL INSTALLATIONS INCLUDING PREFERRED VOLTAGE AND FREQUENCY |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Modified/Technically Equivalent |
Identical/Equivalent Standards : | IEC 60038: 2009 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This standard was originally published in 1988 as IS 12360: 1988 ‘Voltage Bands for Electrical Installations including Preferred Voltages and Frequency’ based on IEC 60038: 1983. IEC 60038 was later revised in 2009. This first revision has been brought out to align the rated voltage levels to the latest version of IEC 60038: 2009. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 24-07-2024 | ------- | ||
2 | P-Draft | 24-07-2024 | Covering letter generated | ------- | |
3 | P-Draft | 24-07-2024 | Duration : 15 Days Remarks : Revision of Standard Supply Voltage Levels |
ETD 1, | ------- |
4 | P-Draft | 12-11-2024 | Covering letter generated | ------- | |
5 | P-Draft | 12-11-2024 | Duration : 15 Days Remarks : Comments received during P-draft stage have been resolved by the concerned panel Working draft standard has been revised accordingly and put up for review of the committee members for 15 days |
ETD 1, | ------- |
6 | Skipped to W-Draft | 11-03-2025 | Stage-Changed | ------- | |
7 | WC Draft | 11-03-2025 | Duration : 30 Days Submitted for HOD approval Remarks : During the 20th ETD 01 meeting the committee decided to wide circulate the draft standard for comments for 30 days |
------- | |
8 | WC Draft | 11-03-2025 | WC approved by HOD |
ETDC ETD 01, | ------- |