Document Details
Name of Department/Committee : CED 22
Document Number : CED 22 ( 26193)
Document Title [English] : Selection Installation and Maintenance of Automatic Fire Detection and Alarm System - Code of Practice Fifth Revision
Document Title [Hindi] : स्वचलित अग्नि संसूचक व संचेतक पद्धति का चुनाव संस्थापन व रख-रखाव - रीती सहिंता (पाँचवाँ पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 13.220.20
Date of Project Approval : 28-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2189: 2008
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 2189: 2008


Classification Details
Group : Fire Fighting Equipments and Accessories
Sub Group : Fire fighting systems
Sub Sub Group : Fire Detection and Alarm Systems
Aspects : Code of Practice
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title : Selection Installation and Maintenance of Automatic Fire Detection and Alarm System
ITCHS Code :
Ministry :
  • Ministry of Home Affairs - Dte. Gen. of Fire Services, Civil Defense and Home Guards
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This draft standard covers the planning, design, selection, installation and maintenance of fire detection and alarm systems. It is applicable to simple systems with a few manual call points as well as to complex installations comprising addressable control and indicating panels, non-addressable detectors, manual call points, control and indication panels, etc.
2 It covers systems capable of providing signals to initiate, in the event of a fire, the operation of ancillary services, such as fire extinguishing systems and other necessary precautions but it does not cover the ancillary services. It covers fire detection and alarm systems installed in buildings of different types including those installed in industries.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-07-2024 22-12-2024 09-03-2025 24-07-2025 Mr. RAJESH CHOUDHARY 22-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-06-2024 -------
2 P-Draft Waived 22-07-2024 As decided by the CED 22 Committee in its 32nd meeting held on 28 June 2024. -------
3 WC Draft 22-07-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 23-07-2024 WC approved by HOD
CEDC  CED 22, CED 36, CED 22 : 2, CED 22 : 3, CED 22 : 4, CED 22 : 5, CED 36 : P1, CED 36 : P2, CED 36 : P3, CED 36 : P4, -------