Document Details
Name of Department/Committee : MTD 04
Document Number : MTD 04 ( 26191)
Document Title [English] : Structural Steel — Part 1 — Hot rolled medium and high tensile non-alloy steel
Document Title [Hindi] : संरचनात्मक इस्पात - भाग 1 - तप्त बेल्लित मध्यम एवं उच्च तन्यता के अमिश्रित इस्पात
Document Type : Revision
Language : English
Priority : 1
ICS Code : 77.140.01
Date of Project Approval : 27-05-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2062: 2011
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 2062: 2011


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Steel and Steel Castings, Wires, Ropes, Pipes , Tubes and other products
Sub Sub Group : Wrought steel Products
Aspects : Product Specification
Risk : Low
Certification : Mandatory Certification
Short Commom Man's Title : Structural Steel — Part 1 — Hot rolled medium and high tensile non-alloy steel
ITCHS Code :
Ministry :
  • Ministry of Steel
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 a) Title has been modified and Amendment No. 1 has been incorporated; b) Number of basic grades has been changed to eleven. New grades E235 and E500 are added in line with ISO/European Standards, to take care of the requirements of medium and high tensile structural steels in the infrastructure and construction segment; c) Table 2 and Table 3 are interchanged. Table1 and Table 3 are added with new grades and modifications in few grades are done in line with ISO/European Standards; d) Clause 13 is removed, Clauses from 14 are rearranged accordingly. Clause 20.2 is removed and 20.3 is rearranged to 19.2; e) New clauses 1.1.3, 3.5, 3.6, 3.7, 12.5, 19.3 are added; Table 1 note 4, Table 3 note 4, note 5, note 6 are also added; and f) Clauses 1.1, 2.0, 3.4, 5.0, 6.2, 7.3, 9.1, Fig.1, 10.1, 10.2, 11.1, 11.2, 12.1.1, new designated clauses 15, 19.1, 19.4.1, table 2, table3 note2 and table 4 have been modified.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 19-07-2024 19-10-2024 19-11-2024 19-01-2025 Mr. Vishal Kumar Rana 19-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-05-2024 -------
2 P-Draft 11-09-2024 Covering letter generated -------
3 P-Draft 11-09-2024 Duration : 21 Days MTD 4, -------
4 Skipped to W-Draft 03-02-2025 Stage-Changed -------