Document Details |
|||||
Name of Department/Committee : | ETD 09 | ||||
---|---|---|---|---|---|
Document Number : | ETD 09 ( 26091) | ||||
Document Title [English] : | Specification for Elastomer Insulated Cables Part 1 for Working Voltages up to and including 1 100 volts (Second Revision) | ||||
Document Title [Hindi] : | ....... | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 1 | ||||
ICS Code : | 621-315-211 | ||||
Date of Project Approval : | 04-07-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Cables, Conductors, Wires and Accessories |
Sub Sub Group : | Power cables |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Mandatory Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard specifies the requirements of elastomer/rubber /silicon insulated cables for fixed wiring, flexible cables and flexible cords for electric power and lighting for operation at voltages up to and including 1 100 volts. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 04-07-2024 | ------- | ||
2 | P-Draft Waived | 04-07-2024 | ------- | ||
3 | WC Draft | 04-07-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 04-07-2024 | WC rejected by HOD Remarks: Foreword needs correction |
------- | |
5 | WC Draft | 08-07-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 09-07-2024 | WC approved by HOD |
ETDC | ------- |
7 | WC Draft | 04-09-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 11-09-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Changes as discussed incorporated |
------- | |
9 | WC Draft | 11-09-2024 | WC rejected by HOD Remarks: Please change the last date for comments in the WC draft |
------- | |
10 | WC Draft | 11-09-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
11 | WC Draft | 12-09-2024 | WC approved by HOD |
ETDC | ------- |