Document Details
Name of Department/Committee : PGD 33
Document Number : PGD 33 ( 26087)
Document Title [English] : Calculation of Load Capacity of Spur and Helical Gears Part 1: Basic Principles Introduction and General Influence Factors
Document Title [Hindi] : स्पर और कुंडलित गियरों की भार क्षमता का परिकलन — भाग 1: मूल सिद्धांत, परिचय और सामान्य प्रभाव कारक
Document Type : New
Language : English
Priority : 3
ICS Code : 21.200
Date of Project Approval : 04-07-2024
Standards to be Superseded :


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Transmission equipments and bearings
Sub Sub Group : Couplings, Gear and chain
Aspects : Methods of tests
Risk : Low
Certification : Voluntary Registration
Short Commom Man's Title : Basic Principles, Introduction and General Influence Factors
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department of Commerce
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 6336-1
Organization Type: ISO

Sl.No. Synosis Points
1 This document presents the basic principles of, an introduction to, and the general influence factors for the calculation of the load capacity of spur and helical gears. Together with the other documents in the ISO 6336 series, it provides a method by which different gear designs can be compared. It is not intended to assure the performance of assembled drive gear systems. It is not intended for use by the general engineering public. Instead, it is intended for use by the experienced gear designer who is capable of selecting reasonable values for the factors in these formulae based on the knowledge of similar designs and the awareness of the effects of the items discussed.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-07-2024 04-12-2024 19-02-2025 04-07-2025 VICHITRA VIR SINGH 04-07-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-07-2024 -------
2 P-Draft Waived 04-07-2024 -------
3 WC Draft 09-07-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 10-07-2024 WC approved by HOD
PGDC  PGD 33, -------