Document Details |
|
Name of Department/Committee : | PGD 33 |
---|---|
Document Number : | PGD 33 ( 26084) |
Document Title [English] : | Calculation of Load Capacity of Spur and Helical Gears Part 3: Calculation of Tooth Bending Strength |
Document Title [Hindi] : | स्पर और कुंडलित गियरों की भार क्षमता का परिकलन — भाग 3: दाँत मुड़ाव सामर्थ्य की गणना |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 21.200 |
Date of Project Approval : | 04-07-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Transmission equipments and bearings |
Sub Sub Group : | Couplings, Gear and chain |
Aspects : | Methods of tests |
Risk : | Low |
Certification : | Voluntary Registration |
Short Commom Man's Title : | Calculation of Tooth Bending Strength |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 6336-3 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies the fundamental formulae for use in tooth bending stress calculations for involute external or internal spur and helical gears with a rim thickness sR > 0,5 ht for external gears and sR > 1,75 mn for internal gears. In service, internal gears can experience failure modes other than tooth bending fatigue that is, fractures starting at the root diameter and progressing radially outward. This document does not provide adequate safety against failure modes other than tooth bending fatigue. All load influences on the tooth root stress are included in so far as they are the result of loads transmitted by the gears and in so far as they can be evaluated quantitatively. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 04-07-2024 | ------- | ||
2 | P-Draft Waived | 04-07-2024 | ------- | ||
3 | WC Draft | 09-07-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 10-07-2024 | WC approved by HOD |
PGDC PGD 33, | ------- |