Document Details |
|
Name of Department/Committee : | MSD 03 |
---|---|
Document Number : | MSD 03 ( 26009) |
Document Title [English] : | Statistical analysis for evaluating the precision of binary measurement methods and their results |
Document Title [Hindi] : | सांख्यिकीय विश्लेषण के लिए बाइनरी माप विधियों और उनके परिणामों की सटीकता के मूल्यांकन |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 03.120.30 |
Date of Project Approval : | 05-03-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Management systems/services and corporate social responsibilities |
Sub Group : | Statistical quality control |
Sub Sub Group : | Statistical Quality Control Methods |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : | |
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | ISO/TR 27877:2021 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document introduces five statistical methods for evaluating the precision of binary measurement methods and their results. The five methods can be divided into two types. Both types are based on measured values provided by each laboratory participating in a collaborative study. In the first type, each laboratory repeatedly measures a single sample. The samples measured by the laboratories are nominally identical. The second type is an extension of the first type, where there are several levels of samples. | |
2 | For each statistical method, this document briefly summarizes its theory and explains how to estimate the proposed precision measures. Some real cases are illustrated to help the readers understand the evaluation procedures involved. For the first and second types of methods, five and three cases are presented, respectively. | |
3 | Finally, this document compares the five statistical methods. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 05-03-2024 | ------- | ||
2 | P-Draft Waived | 09-07-2024 | ------- | ||
3 | WC Draft | 09-07-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 23-07-2024 | WC approved by HOD |
MSDC MSD 03, | ------- |