Document Details
Name of Department/Committee : CED 46
Document Number : CED 46 ( 26991)
Document Title [English] : National Building Code of India Part 3 Development Control Rules and General Building Requirements
Document Title [Hindi] : भारतीय राष्ट्रीय भवन संहिता भाग 3 विकास नियंत्रण नियम तथा भवन की सामान्य अपेक्षाएँ
Document Type : Revision
Language : English
Priority : 3
ICS Code : 01.120: 91.040.01
Date of Project Approval : 18-01-2024
Standards to be Revised :
Sl.No. Is No & Year
1 SP 7: 2016
Standards to be Superseded :
Sl.No. Is No & Year
1 SP 7: 2016


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : NBC of India
Aspects : Others
Risk : High
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
  • GOOD HEALTH AND WELL BEING
  • SUSTAINABLE CITIES AND COMMUNITIES
  • RESPOSIBLE CONSUMPTION AND PRODUCTION
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Title of this Part is modified to reflect ‘development promotion’ particularly those incentives and regulations that encourage responsible and sustainable urban development
2 Annex A on parking requirements has been updated reflecting the concept of arriving parking spaces through equivalent car space (ECS).
3 Annex B on requirements for accessibility in environments for the elderly and persons with disabilities has been updated in line with IS 4963:2025 ‘Accessibility in built environment for older adults and persons with disabilities — Requirements (second revision) under publication’.
4 Requirements for preventing crime and resilience against extreme events have been included, in 30.
5 Requirements for coastal area development have been included, in 31.
6 Various urban design features have been listed, in 32 and guiding provisions have been suggested for creches and old age homes.
7 Land use classification has been further updated, in clause 3, which needs to be reflected in the master plans and land use zone maps.
8 Provisions of Transferable Development Rights (TDR), Accommodation Reservation (AR) and Compensatory Floor Area Ratio (CFAR) have been updated in 3.7, 3.8 and 3.9.
9 Provisions relating to Reservation Credit Certificate (RCC) have been included in 3.10.
10 Provisions relating to Purchasable Floor Area Ratio (PFAR) have been included in 3.11.
11 Provisions relating to means of access including the right of way and length of means of access have been updated, in 4.
12 A new clause on Transit orient development (TOD) has been introduced, in 34.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-11-2024 28-04-2025 13-07-2025 28-11-2025 S ARUN KUMAR 28-11-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-01-2024 -------
2 P-Draft 28-11-2024 Covering letter generated -------
3 P-Draft 28-11-2024 Duration : 21 Days CED 46, CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P9, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22,  -------
4 Skipped to W-Draft 02-04-2025 Stage-Changed -------
5 WC Draft 02-04-2025 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 02-04-2025 WC approved by HOD
CEDC  CED 46, CED 51, CED 12, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, SSD 06, SSD 21, SSD 22, CED 59, -------