Document Details |
|
Name of Department/Committee : | FAD 16 |
---|---|
Document Number : | FAD 16 ( 26964) |
Document Title [English] : | Sealed Silos for Storage of Foodgrains - Sealing Requirements |
Document Title [Hindi] : | अनाज भंडारण के लिए सीलबंद साइलो – सीलिंग की आवश्यकताएँ |
Document Type : | New |
Language : | English |
Priority : | 1 |
ICS Code : | 55.221; 67.060 |
Date of Project Approval : | 20-08-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Raw Agricultural products |
Sub Sub Group : | Foodgrain storage structures and code of practice |
Aspects : | Others |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard outlines performance specifications for airtight silos designed to minimize post-harvest losses and ensure effective fumigation for pest control. It specifies gas-tightness criteria, including the use of pressure tests like the Half-Life Pressure Decay Test, to verify silo integrity. The standard also includes guidelines for structural design, maintenance, and sealing of vents, joints, and pressure relief systems. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 20-08-2024 | ------- | ||
2 | P-Draft | 21-11-2024 | Covering letter generated | ------- | |
3 | P-Draft | 21-11-2024 | Duration : 21 Days | FAD 16, | ------- |
4 | Skipped to W-Draft | 03-01-2025 | Stage-Changed | ------- | |
5 | WC Draft | 03-01-2025 | Duration : 30 Days Submitted for HOD approval Remarks : FAD 16 in its 29th meeting held on 02 December 2024 decided to issue draft standard into wide circulation for a period of 30 days |
------- | |
6 | WC Draft | 03-01-2025 | WC rejected by HOD Remarks: As discused. |
------- | |
7 | WC Draft | 09-01-2025 | Duration : 30 Days Submitted for HOD approval Remarks : Modified draft is attached |
------- | |
8 | WC Draft | 09-01-2025 | WC approved by HOD |
FADC | ------- |