Document Details |
|
Name of Department/Committee : | CED 48 |
---|---|
Document Number : | CED 48 ( 26957) |
Document Title [English] : | Numerical Modelling in Rock Engineering - Guidelines |
Document Title [Hindi] : | रॉक इंजीनियरिंग में संख्यात्मक मॉडलिंग — मार्गदर्शी सिद्धांत |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 93.020 |
Date of Project Approval : | 30-09-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Foundation Engineering |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | Numerical Modelling in Rock Engineering |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Numerical modelling and analysis are being used for the designs in almost all the infrastructure projects in rock masses. Various tools/codes for the numerical analysis are available and are being used for the design purposes. This code presents the guidelines for the use of numerical modelling & analysis in rock engineering and highlight important points, which shall be covered at every stage of numerical modelling and analysis. It is also highlighted to give the justification at every stage/steps. Limitations of the numerical modelling shall also be clearly brought in the report. These guidelines also highlight the need of carrying out the numerical modelling and analysis during the construction stage of the project for the back-analysis. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 30-09-2024 | ------- | ||
2 | P-Draft | 22-11-2024 | Covering letter generated | ------- | |
3 | P-Draft | 22-11-2024 | Duration : 21 Days | CED 48, CED 48, CED 56, | ------- |
4 | Skipped to W-Draft | 04-02-2025 | Stage-Changed | ------- | |
5 | WC Draft | 04-02-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 04-02-2025 | WC approved by HOD |
CEDC | ------- |