Document Details
Name of Department/Committee : CHD 16
Document Number : CHD 16 ( 26946)
Document Title [English] : Kraft Liner and Corrugating Medium Specification Second Revision
Document Title [Hindi] : क्राफ्ट लाइनर और कोरुगेटिंग मिडियम — विशिष्टि ( दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : 85.080
Date of Project Approval : 06-09-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9588: 1990
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : General and consumer products and raw materials
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Kraft Liner and Corrugating Medium
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 In this second revision, The following modifications are being incorporated: a) Title and Scope of the standard are being expended to incorporate corrugating medium, too; b) The references clause is being updated; c) Terminology of Liner is being updated and a new terminology for Corrugating Medium is being incorporated; d) 3 grades of corrugating medium are being incorporated; e) The manufacture, finish and workmanship, grammage and requirements (burst index, pH, moisture, cobb test and ring crush) are being modified for kraft liner. The requirement of stiffness is being removed. f) The Grammage, finish and workmanship, tolerance and requirements are being specified for corrugating medium. g) Referred standards for the test methods have been updated, as the IS 1060 (Part 1) is being revised and the test methods have been split in various parts and sections covering the different tests; h) Amendment 1 and 2 are being amalgamated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-11-2024 18-03-2025 18-04-2025 18-08-2025 VIRENDRA SINGH 18-11-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-09-2024 -------
2 P-Draft Waived 18-11-2024 During the 17th meeting of CHD 16 held on 06th September 2024 the committee decided to wide circulate the document for a period two months -------
3 WC Draft 18-11-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : During the 17th meeting of CHD 16 held on 06th September 2024 the committee decided to wide circulate the document for a period two months
-------
4 WC Draft 18-11-2024 WC rejected by HOD
Remarks: Please review the Foreword.
-------