Document Details |
|||||
Name of Department/Committee : | ETD 15 | ||||
---|---|---|---|---|---|
Document Number : | ETD 15 ( 26890) | ||||
Document Title [English] : | Guide for testing single - Phase AC and universal motors (First Revision) | ||||
Document Title [Hindi] : | सिंगल-फेज ए .सी . और यूनिवर्सल मोटर्स के परीक्षण के लिए मार्गदर्शक (पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | UDC 621.313.13.025.1 : 620.1 | ||||
Date of Project Approval : | 27-09-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Motors, Winding Wires and Accessories |
Sub Sub Group : | Motors, Generators & Turbines |
Aspects : | Terminology |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Modified/Technically Equivalent |
Identical/Equivalent Standards : | IEC 60034-1-2021 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This guide covers methods for conducting the generally applicable tests to determine the performance characteristics of single-phase motors. It is not intended that the standard shall cover all possible tests used in production or tests of research nature. The guide shall not be deemed as making it obligatory to carry out any or all the tests specified in this standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-09-2024 | ------- | ||
2 | P-Draft | 06-11-2024 | Covering letter generated | ------- | |
3 | P-Draft | 06-11-2024 | Duration : 14 Days | ETD 15, | ------- |
4 | Skipped to W-Draft | 11-12-2024 | Stage-Changed | ------- | |
5 | WC Draft | 11-12-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 11-12-2024 | WC rejected by HOD Remarks: correction |
------- | |
7 | WC Draft | 11-12-2024 | Duration : 30 Days Submitted for HOD approval Remarks : WC approved by committee |
------- | |
8 | WC Draft | 16-12-2024 | WC approved by HOD |
ETDC ETD 15, | ------- |