Document Details
Name of Department/Committee : MTD 26
Document Number : MTD 26 ( 26884)
Document Title [English] : Industrial furnaces and associated processing equipment -- Safety -- Part 2: Combustion and fuel handling systems First Revision
Document Title [Hindi] : औद्योगिक भट्टियाँ और सम्बन्ध प्रसंस्करण उपकरण - सुरक्षा भाग 2 दहन और ईंधन प्रबंधन प्रणाली (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 13.100; 25.180.01
Date of Project Approval : 15-03-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 17984 : Part 2: 2024
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 17984 : Part 2: 2024


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Furnace and its accessories
Sub Sub Group : Code of Practice, Glossary on Furnaces
Aspects : Safety Standard
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 13577-2:2023
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies the safety requirements for combustion and fuel handling systems that are part of industrial furnaces and associated processing equipment (TPE), including single and multiple burner systems in thermoprocessing equipment and machines. NOTE The general safety requirements common to TPE are provided in ISO 13577-1:2016. ISO 13577-1:2016, Annex B also includes a list of processes for which industrial furnaces and heating systems covered by the ISO 13577 series are used. This document deals with significant hazards, hazardous situations and events relevant to combustion and fuel handling systems as listed in Annex A, when used as intended and under the conditions for use as described in the instruction handbook. This document covers: — fuel pipework downstream of and including the manual isolating valve; — combustion air supply (including oxygen and oxygen enriched combustion air) and flue gas system; — burner(s), burner system and ignition device;
2 functional requirements for safety related control system. This document applies to any oxidation of gaseous and liquid fuels with air or other gases containing free oxygen to release thermal energy in TPE. Annex B includes examples of gaseous and liquid fuels. For thermal or catalytic post combustion and waste incineration, this document applies only to auxiliary burners designed to start-up and/or support the process. The pressure hazard of the piping and components covered by this document is within the maximum pressure/size relationship of category I as specified in Annex C. This document also gives the necessary requirements regarding information for use.This document does not cover hazards from heating generated by electricity. This document does not deal with the hazards created by the release of flammable substances from the products processed in the TPE.
3 This document is not applicable to combustion and fuel handling systems: — of gas welding and allied processes; — up-stream of the TPE manual isolating valve. This document is not applicable to industrial furnaces and associated processing equipment (TPE), including single and multiple burner systems in thermoprocessing equipment and machines manufactured before the date of its publication. This document is not applicable to blast furnaces, converters (in steel plants), boilers, fired heaters (including reformer furnaces) in the petrochemical and chemical industries. This document is not applicable to electrical cabling and power cabling upstream of the TPE control panel/protective system.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 05-11-2024 05-04-2025 20-06-2025 04-11-2025 Ms. CHALLAKONDA VIDISHA 05-11-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 15-03-2024 -------
2 P-Draft Waived 25-11-2024 Since, it is an ISO adoption -------
3 WC Draft 25-11-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : For your comments and views
-------
4 WC Draft 25-11-2024 WC approved by HOD
MTDC   -------