Document Details |
|||||
Name of Department/Committee : | CED 44 | ||||
---|---|---|---|---|---|
Document Number : | CED 44 ( 26854) | ||||
Document Title [English] : | Method of Measurement of Building and Civil Engineering Works Part 22 Materials | ||||
Document Title [Hindi] : | भवन की माप की विधि एवं सिविल इंजीनियरिंग कार्य भाग 22 सामग्री | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 17.020; 91.040.01; 93.010 | ||||
Date of Project Approval : | 30-09-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | Methods of Measurement of building and civil engineering works and Handbook |
Aspects : | Others |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The significant modification in this revision is that the measurement of new building materials like manufactured aggregates, wood composite plastic, dry and oil based distemper, sandwich panels, etc have been incorporated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 30-09-2024 | ------- | ||
2 | P-Draft | 30-10-2024 | Covering letter generated | ------- | |
3 | P-Draft | 30-10-2024 | Duration : 19 Days | CED 44, | ------- |
4 | Skipped to W-Draft | 06-01-2025 | Stage-Changed | ------- | |
5 | WC Draft | 06-01-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 06-01-2025 | WC approved by HOD |
CEDC CED 02, | ------- |