Document Details |
|||||
Name of Department/Committee : | CED 13 | ||||
---|---|---|---|---|---|
Document Number : | CED 13 ( 26769) | ||||
Document Title [English] : | Fixing Devices in Walls, Ceilings and Floors of Solid Construction Part 1 Devices Other Than Post-Installed Anchors - Code of Practice (First Revision) | ||||
Document Title [Hindi] : | ठोस निर्माण की दीवारों, छतों और फर्शों में उपकरण लगाना भाग 1 पोस्ट-इंस्टॉल किए गए एंकर के अलावा अन्य उपकरण — रीति संहिता का भारतीय मानक प्रारूप (पहला संशोधन) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 91.190 | ||||
Date of Project Approval : | 09-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | General Construction, Painting and Glazing |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This code is intended chiefly to lay down requirements regarding the different types of fixing devices commonly used in the industry and methods of installation, and it does not include all the necessary provisions of a contract. | |
2 | Use of proper devices and trained installer will ensure a neat fixing work with minimum effort and little damage, and the fixtures will have adequate strength and durability. This standard attempts to provide the necessary guidance for their selection and fixing, also giving their essential dimensions and features, and situations of use |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 09-08-2024 | ------- | ||
2 | P-Draft | 16-10-2024 | Covering letter generated | ------- | |
3 | P-Draft | 16-10-2024 | Duration : 30 Days | CED 13, | ------- |
4 | Skipped to W-Draft | 11-02-2025 | Stage-Changed | ------- | |
5 | WC Draft | 11-02-2025 | Duration : 28 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 11-02-2025 | WC approved by HOD |
CEDC CED 13, CED 02, | ------- |
7 | WC-Draft | 12-02-2025 | WC-Draft Email Notifications Sent | CEDC, CED 13, | ------- |