Document Details
Name of Department/Committee : CED 13
Document Number : CED 13 ( 26769)
Document Title [English] : Fixing Devices in Walls, Ceilings and Floors of Solid Construction Part 1 Devices Other Than Post-Installed Anchors - Code of Practice (First Revision)
Document Title [Hindi] : ठोस निर्माण की दीवारों, छतों और फर्शों में उपकरण लगाना भाग 1 पोस्ट-इंस्टॉल किए गए एंकर के अलावा अन्य उपकरण — रीति संहिता का भारतीय मानक प्रारूप (पहला संशोधन)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 91.190
Date of Project Approval : 09-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1946: 1961
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1946: 1961


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : General Construction, Painting and Glazing
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This code is intended chiefly to lay down requirements regarding the different types of fixing devices commonly used in the industry and methods of installation, and it does not include all the necessary provisions of a contract.
2 Use of proper devices and trained installer will ensure a neat fixing work with minimum effort and little damage, and the fixtures will have adequate strength and durability. This standard attempts to provide the necessary guidance for their selection and fixing, also giving their essential dimensions and features, and situations of use

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 16-10-2024 16-03-2025 31-05-2025 16-10-2025 Mr. PRASHANT YADAV 16-10-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 09-08-2024 -------
2 P-Draft 16-10-2024 Covering letter generated -------
3 P-Draft 16-10-2024 Duration : 30 Days CED 13, -------
4 Skipped to W-Draft 11-02-2025 Stage-Changed -------
5 WC Draft 11-02-2025 Duration : 28 Days
Submitted for HOD approval
-------
6 WC Draft 11-02-2025 WC approved by HOD
CEDC  CED 13, CED 02, -------
7 WC-Draft 12-02-2025 WC-Draft Email Notifications Sent CEDC, CED 13, -------