Document Details |
|||||
Name of Department/Committee : | CED 39 | ||||
---|---|---|---|---|---|
Document Number : | CED 39 ( 26741) | ||||
Document Title [English] : | Earthquake Safety Assessment and Retrofitting of Structures Part 1 General Provisions Second Revision of IS 13935 | ||||
Document Title [Hindi] : | संरचनाओं का भूकंप सुरक्षा मूल्यांकन और पुनःसंयोजन भाग 1 सामान्य प्रावधान (IS 13935 का दूसरा पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 91.120.25 | ||||
Date of Project Approval : | 27-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Concrete structures |
Sub Sub Group : | Special Structures |
Aspects : | Code of Practice |
Risk : | Medium |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The stock of housing in India alone is over 32 crores, and the stock of the other structures is of a comparable number. A significant share of this stock is in landmass that is likely to sustain moderate to severe earthquake ground shaking. Much of this existing stock of structures in India is unregulated construction, owing to absence of necessary techno-legal process to examine the structural safety of the built environment at the municipal offices across the country. Past earthquakes in India show that large losses of life is attributed primarily due to the collapse of structures. To prevent this, it is essential to assess and retrofit structures before the impending earthquakes. When doing so, efforts should be made to reduce the carbon footprint (say by 70 percent) as a step towards sustainable development. | |
2 | The provisions of this standard are applicable for: a) Assessing the earthquake behaviour of existing structures that are not damaged during earthquake and new structures that are being designed as per the relevant national standards. b) Retrofitting of structures that are found to be deficient against design earthquake effects. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-08-2024 | ------- | ||
2 | P-Draft Waived | 15-10-2024 | ------- | ||
3 | WC Draft | 15-10-2024 | Duration : 45 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 16-10-2024 | WC approved by HOD |
CEDC | ------- |