Document Details
Name of Department/Committee : CED 30
Document Number : CED 30 ( 26671)
Document Title [English] : Heavy Duty Burnt Clay Building Bricks Specification
Document Title [Hindi] : हेवी ड्यूटी जली हुई मिट्टी से बनी ईंटें – विशिष्टता
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS No. 91.100.25
Date of Project Approval : 06-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2180: 1988
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 2180: 1988


Classification Details
Group : Building Materials including Paints
Sub Group : Clay products
Sub Sub Group : Bricks, blocks and other clay products
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • RESPOSIBLE CONSUMPTION AND PRODUCTION
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The requirements of bricks to be free from flaws and nodules of free lime have been removed.
2 It has been highlighted that bricks of 40 mm height are not recommended for structural use.
3 The maximum individual variation of compressive strength from the mean value has been reduced to 15 percent.
4 The concept of shape factor for 40mm high bricks have been introduced.
5 The minimum bulk density of the bricks has been modified to 2 200 kg/cm3.
6 The requirements for warpage have been revised.
7 The provision to eliminate frogs in bricks of 40 mm made by extrusion process has been included.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 01-10-2024 01-03-2025 16-05-2025 01-10-2025 DIVYA S 01-10-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-08-2024 -------
2 P-Draft 01-10-2024 Covering letter generated -------
3 P-Draft 01-10-2024 Duration : 21 Days CED 30, -------
4 Skipped to W-Draft 09-01-2025 Stage-Changed -------
5 WC Draft 09-01-2025 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 10-01-2025 WC approved by HOD
CEDC   -------