Document Details
Name of Department/Committee : ETD 14
Document Number : ETD 14 ( 26655)
Document Title [English] : Cable management Cable tray systems and cable ladder systems (First Revision)
Document Title [Hindi] : केबल प्रबंधन - केबल ट्रे प्रणाली और केबल सीढ़ी प्रणाली (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 29.120.10
Date of Project Approval : 13-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61537 : 2006
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61537 : 2006


Classification Details
Group : Electrical Appliances and Accessories
Sub Group : Plugs, Sockets, Switches and accessories
Sub Sub Group : Switch plugs, sockets and accessories
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61537:2023
Organization Type: IEC

Sl.No. Synosis Points
1 This document specifies requirements and tests for cable tray systems and cable ladder systems intended for the support and accommodation of cables and possibly other electrical equipment in electrical and/or communication systems installations. Where necessary, cable tray systems and cable ladder systems can be used for the arrangement of cables into groups.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-09-2024 28-02-2025 13-05-2025 28-09-2025 Ms. ANKITA TRIPATHI 28-09-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-06-2024 -------
2 P-Draft 28-09-2024 Covering letter generated -------
3 P-Draft 28-09-2024 Duration : 30 Days ETD 14, -------
4 Skipped to W-Draft 21-02-2025 Stage-Changed -------
5 WC Draft 21-02-2025 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 22-02-2025 WC approved by HOD
ETDC  ETD 14, -------