Document Details |
|||||
Name of Department/Committee : | LITD 08 | ||||
---|---|---|---|---|---|
Document Number : | LITD 08 ( 26600) | ||||
Document Title [English] : | Acoustics Reference zero for the calibration of audiometric equipment Part 1: Reference equivalent threshold sound pressure levels for pure tones and supra-aural earphones Second Revision | ||||
Document Title [Hindi] : | ध्वनि-विज्ञान, ऑडियोमेट्रिक उपकरणों के अंशांकन के लिए संदर्भ शून्य - भाग 1: शुद्ध स्वर और सुप्रा-ऑरल इयरफ़ोन के लिए संदर्भ समतुल्य सीमा ध्वनि दबाव स्तर (दूसरा संशोधन) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 13.140 | ||||
Date of Project Approval : | 09-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Electronic components and devices |
Sub Sub Group : | Testing procedures for electromechanical components |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 389-1:2017 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | Each document in the ISO 389 series specifies reference threshold levels for the calibration of audiometric equipment. This document is applicable to equipment for pure-tone air-conduction audiometry that uses supra-aural earphones. | |
2 | These model-specific RETSPL values are given in this document in separate tables, along with the IEC 60318-3 acoustic coupler RETSPLs for Telephonics TDH 391 and Beyer DT 482 earphones, which were adopted from the former editions of ISO 389 |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 09-08-2024 | ------- | ||
2 | P-Draft | 19-09-2024 | Covering letter generated | ------- | |
3 | P-Draft | 19-09-2024 | Duration : 30 Days Remarks : The committee decided to issue P-draft for a period of One month all committee members are requested to provide their inputs on 19 October 2024 |
LITD 8, LITD 08, | ------- |
4 | Skipped to W-Draft | 20-11-2024 | Stage-Changed | ------- | |
5 | WC Draft | 20-11-2024 | Duration : 60 Days Submitted for HOD approval Remarks : The committee in its 12th meeting decided to issue this document in Wide circulation Member are requested to kindly provide input and comments |
------- |