Document Details
Name of Department/Committee : WRD 09
Document Number : WRD 09 ( 26589)
Document Title [English] : Criteria for Design of Hydraulic Jump Type Stilling Basins with Horizontal and Sloping Apron
Document Title [Hindi] : क्षैतिज और प्रवण एप्रन के साथ द्रव-चालित जंप टाइप स्टिलिंग बेसिन के डिजाइन के लिए मानदंड
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 30-07-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 4997: 1968
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 4997: 1968


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Design, Construction, Planning related to Dams
Aspects : Code of Practice
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti - Department of Water Resources, River Development and Ganga Rejuvenation
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The design of downstream protection works or energy dissipators below hydraulic structures occupies a vital place in the design and construction of dams, weirs and barrages. The problem of designing energy dissipators is one essentially of reducing the high-velocity flow to a velocity low enough to minimize erosion of the natural river bed.
2 This standard was first published in 1968. The first revision of this standard incorporates the latest generalised design trends in vogue emphasizing the operational aspects of stilling basin. Following are the major changes incorporated in the first revision of this standard: a) Provision of divide walls; b) Necessity of cylindrical end sill; c) Bulking of flow and stilling basin free board; d) Calculation of head loss due to friction over the spillway surface; e) Informative list of projects with stilling basin as energy dissipator for existing and proposed dam spillways; and f) Graphs for ratio of tail water depth to D1 with respect to Froude number incorporated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-09-2024 18-02-2025 03-05-2025 18-09-2025 Mr. Vaibhav Jindal 18-09-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 30-07-2024 -------
2 P-Draft Waived 18-09-2024 -------
3 WC Draft 18-09-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 19-09-2024 WC rejected by HOD
Remarks: resubmit the document as discussed
-------
5 WC Draft 19-09-2024 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 19-09-2024 WC approved by HOD
WRDC  WRD 09, -------