Document Details |
|||||
Name of Department/Committee : | FAD 11 | ||||
---|---|---|---|---|---|
Document Number : | FAD 11 ( 26579) | ||||
Document Title [English] : | BLADES FOR ROTARY TILLER ROTAVATOR POWER TILLERTRACTOR DRIVEN SPECIFICATION Second Revision of IS 6690 | ||||
Document Title [Hindi] : | रोटरी टिलर (रोटावेटर) के लिए ब्लेड — पावर टिलर/ट्रैक्टर चालित — विशिष्टि (आइ एस 6690 का दूसरा पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 65.060.20 | ||||
Date of Project Approval : | 28-02-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Agricultural Implements and godowns |
Sub Sub Group : | Pre and Post Harvest Equipment equipment |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard specifies material, hardness, dimensions and other requirements for blades used in rotary tillers (rotavators) operated by tractors or power tillers |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-02-2024 | ------- | ||
2 | P-Draft Waived | 17-09-2024 | The FAD 11 committee in its 26th meeting decided to send the draft revision of IS 6690 into for wide circulation. | ------- | |
3 | WC Draft | 17-09-2024 | Duration : 62 Days Submitted for HOD approval Remarks : The FAD 11 committee in its 26th meeting held on 28 February decided to send the draft revision of IS 6690 into for wide circulation for a period of 60 days |
------- | |
4 | WC Draft | 17-09-2024 | WC rejected by HOD Remarks: As discussed. |
------- | |
5 | WC Draft | 17-09-2024 | Duration : 62 Days Submitted for HOD approval Remarks : Correct draft uploaded |
------- | |
6 | WC Draft | 17-09-2024 | WC approved by HOD |
FADC FAD 11 : P6, | ------- |