Document Details |
|||||
Name of Department/Committee : | WRD 14 | ||||
---|---|---|---|---|---|
Document Number : | WRD 14 ( 26562) | ||||
Document Title [English] : | DESIGN OF TUNNELS CONVEYING WATER PART 1 GENERAL DESIGN - CODE OF PRACTICE Second Revision of IS 4880 Part 1 | ||||
Document Title [Hindi] : | पानी पहुंचाने वाली सुरंगो का डिजाइन करना भाग 1 सामान्य डिजाइन - रीति संहिता (4880 Part 1 का दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 13-09-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Water Conductor Systems |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This revision (second revision) has been brought out to bring the standard in the latest style and format of the Indian Standards. In addition, the following major changes have been incorporated: a) The scale and contour interval in the Survey of India Topo Sheets under clause 2.2.1 have been modified to allow for more detailed mapping, which improves the accuracy of the tunnel alignment process. b) Clause 2.3 has been modified to incorporate geological investigations to be carried with modern investigation methods in accordance with the provisions contained in IS 17883: 2022 ‘Geological Exploration for Tunnels Guidelines’. c) Clause 2.3.2 has been modified to mandate geophysical investigations before exploratory drilling and drifting activities. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 13-09-2024 | ------- | ||
2 | P-Draft Waived | 13-09-2024 | ------- | ||
3 | WC Draft | 13-09-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 13-09-2024 | WC rejected by HOD Remarks: Resubmit with the corrections mentioned |
------- | |
5 | WC Draft | 13-09-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 13-09-2024 | WC approved by HOD |
WRDC WRD 14, | ------- |