Document Details |
|||||
Name of Department/Committee : | TXD 30 | ||||
---|---|---|---|---|---|
Document Number : | TXD 30 ( 26519) | ||||
Document Title [English] : | Geotextiles and geotextile-related products - Screening test methods for determining the resistance to acid and alkaline liquids (first revision) | ||||
Document Title [Hindi] : | भूवस्त्रादि और भूवस्त्रादि संबंधित उत्पाद — तरल पदार्थों से प्रतिरोधिता को निर्धारित करने के लिए जांच परीक्षण विधि (पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 59.080.70 | ||||
Date of Project Approval : | 09-08-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Textile, Textile Products and Machinery |
Sub Group : | Textile for special use |
Sub Sub Group : | Geo-synthetics |
Aspects : | Methods of tests |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 12960:2020 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies methods for screening the resistance of geotextile and geotextile-related products to liquids while not subjecting them to external mechanical stress. It is applicable to all geotextiles and geotextile-related products. Method A applies particularly to polyamides and method B to polyesters and polyamides. The test results are intended to be interpreted in the context of site conditions. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 09-08-2024 | ------- | ||
2 | P-Draft | 10-09-2024 | Covering letter generated | ------- | |
3 | P-Draft | 10-09-2024 | Duration : 3 Days | TXD 30, | ------- |
4 | Skipped to W-Draft | 16-09-2024 | Stage-Changed | ------- | |
5 | WC Draft | 16-09-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 17-09-2024 | WC rejected by HOD Remarks: Pl make changes as discussed |
------- | |
7 | WC Draft | 17-09-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 17-09-2024 | WC approved by HOD |
TXDC | ------- |