Document Details |
|||||
Name of Department/Committee : | CED 02 | ||||
---|---|---|---|---|---|
Document Number : | CED 02 ( 26500) | ||||
Document Title [English] : | Supersulphated Cement - Specification (Second Revision of IS 6909) | ||||
Document Title [Hindi] : | अतिसल्फेट कृत सीमेंट — विशिष्टि (IS 6909 का दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 01.040.91 | ||||
Date of Project Approval : | 17-05-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Concrete structures |
Sub Sub Group : | Special Structures |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Mandatory Certification |
Short Commom Man's Title : | Supersulphated Cement |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Supersulphated cement has been successfully used in a variety of aggressive conditions, for example, for marine works, mass concrete jobs to resist the attack by aggressive water, reinforced concrete pipes in ground water, concrete construction in sulphate bearing soils, and in chemical works under conditions involving exposure to high concentrations of sulphates of weak solutions of mineral acids. It has been used for the underside of bridges over railways and for concrete sewers carrying industrial effluents. Its use under tropical conditions has also been recommended, provided the prevailing temperature is below 40°C | |
2 | This standard covers the requirements for composition, manufacture and testing of supersulphated cement. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 17-05-2024 | ------- | ||
2 | P-Draft Waived | 04-09-2024 | ------- | ||
3 | WC Draft | 04-09-2024 | Duration : 57 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 05-09-2024 | WC approved by HOD |
CEDC | ------- |