Document Details
Name of Department/Committee : CED 46
Document Number : CED 46 ( 26491)
Document Title [English] : National Building Code of India: Part 8 Building Services Section 5 Installation of Lifts Escalators Moving Walks and Parking Systems 5C Power Driven Parking Systems
Document Title [Hindi] : राष्ट्रीय भवन निर्माण संहिता भाग 8 भवन निर्माण सेवाएँ अनुभाग 5 लिफ्ट, स्वचालित सीढियाँ, चलपथ तथा पार्किंग प्रणाली की स्थापना : 5सी शक्ति चालित पार्किंग प्रणाली
Document Type : Revision
Language : English
Priority : 3
ICS Code : 01.120: 91.040.01
Date of Project Approval : 15-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 SP 7: 2016
Standards to be Superseded :
Sl.No. Is No & Year
1 SP 7: 2016


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : NBC of India
Aspects : Others
Risk : High
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The following important provisions are addressed in this new Subsection: a) Automated parking systems – Fully automated car parks allow drivers to leave their vehicles at designated entry points, from where the vehicles are transported and parked automatically. This system minimizes human intervention, reduces parking time, and enhances space utilization. b) Car lifts and ramps – In semi-automated systems, the movement of cars depends on the use of car lifts and/or ramps. It is essential to conduct a detailed analysis to determine the optimal number of car lifts required, ensuring that the average car retrieval/parking time does not exceed 3 min. c) Design and safety – Car lifts shall be designed to accommodate the largest vehicles intended for use, providing adequate space for door opening to facilitate passenger evacuation in case of emergencies. Additionally, designers shall account for potential queues and provide sufficient holding areas for vehicles.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 03-09-2024 03-02-2025 18-04-2025 02-09-2025 S ARUN KUMAR 03-09-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 15-04-2024 -------
2 P-Draft 03-09-2024 Covering letter generated -------
3 P-Draft 03-09-2024 Duration : 21 Days
Remarks :
CED 46, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18,  -------
4 Skipped to W-Draft 08-03-2025 Stage-Changed -------
5 WC Draft 08-03-2025 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 08-03-2025 WC approved by HOD
CEDC  CED 46, ETD 25, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, -------