Document Details |
|||||
Name of Department/Committee : | CED 46 | ||||
---|---|---|---|---|---|
Document Number : | CED 46 ( 26491) | ||||
Document Title [English] : | National Building Code of India: Part 8 Building Services Section 5 Installation of Lifts Escalators Moving Walks and Parking Systems 5C Power Driven Parking Systems | ||||
Document Title [Hindi] : | राष्ट्रीय भवन निर्माण संहिता भाग 8 भवन निर्माण सेवाएँ अनुभाग 5 लिफ्ट, स्वचालित सीढियाँ, चलपथ तथा पार्किंग प्रणाली की स्थापना : 5सी शक्ति चालित पार्किंग प्रणाली | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 01.120: 91.040.01 | ||||
Date of Project Approval : | 15-04-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | NBC of India |
Aspects : | Others |
Risk : | High |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The following important provisions are addressed in this new Subsection: a) Automated parking systems – Fully automated car parks allow drivers to leave their vehicles at designated entry points, from where the vehicles are transported and parked automatically. This system minimizes human intervention, reduces parking time, and enhances space utilization. b) Car lifts and ramps – In semi-automated systems, the movement of cars depends on the use of car lifts and/or ramps. It is essential to conduct a detailed analysis to determine the optimal number of car lifts required, ensuring that the average car retrieval/parking time does not exceed 3 min. c) Design and safety – Car lifts shall be designed to accommodate the largest vehicles intended for use, providing adequate space for door opening to facilitate passenger evacuation in case of emergencies. Additionally, designers shall account for potential queues and provide sufficient holding areas for vehicles. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 15-04-2024 | ------- | ||
2 | P-Draft | 03-09-2024 | Covering letter generated | ------- | |
3 | P-Draft | 03-09-2024 | Duration : 21 Days Remarks : |
CED 46, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, | ------- |
4 | Skipped to W-Draft | 08-03-2025 | Stage-Changed | ------- | |
5 | WC Draft | 08-03-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 08-03-2025 | WC approved by HOD |
CEDC CED 46, ETD 25, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, | ------- |