Document Details
Name of Department/Committee : MTD 11
Document Number : MTD 11 ( 26452)
Document Title [English] : Fusion welded joints and weld metal in steel Method of test: Part 3 Destructive tests on welds in metallic materials Transverse tensile test Fifth Revision
Document Title [Hindi] : स्टील में फ्यूज़न वेल्डेड जोड़ और वेल्ड धातु — परीक्षण पद्धति: भाग 3 धात्विक सामग्रियों में वेल्ड पर विनाशी परीक्षण — अनुप्रस्थ तन्यता परीक्षण (पाँचवाँ पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 25.160.40
Date of Project Approval : 07-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 3600 : Part 3: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 3600 : Part 3: 2018


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Welding Electrodes and Accessories
Sub Sub Group : Test Methods of welding
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title : Fusion welded joints and weld metal in steel — Method of test: Part 3 Destructive tests on welds in
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 4136 : 2022
Organization Type: ISO

Sl.No. Synosis Points
1 The prescription of the ambient temperature has been updated to conform with ISO 6892-1;
2 Table 1 has been updated and figures have been changed accordingly;
3 The diameter of pipes has been clarified;
4 The determination of section SO has been clarified; and
5 A Bibliography has been created.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-08-2024 29-01-2025 13-04-2025 28-08-2025 Mr. Vishal Kumar Rana 29-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-06-2024 -------
2 P-Draft Waived 04-10-2024 The committee in its 25th TC meeting held on 07th June 2024 decided to wide circulate the document. -------
3 WC Draft 04-10-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 07-10-2024 WC approved by HOD
MTDC   -------