Document Details
Name of Department/Committee : PGD 37
Document Number : PGD 37 ( 26432)
Document Title [English] : ISO general purpose metric screw threads: Part 3 Basic dimensions (third revision)
Document Title [Hindi] : आई০ एस০ ओ০ सामान्य प्रयोजन की मीटरी पेंच चूड़ियाँ भाग 3 आधारभूत आयाम (तीसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 21.040.10
Date of Project Approval : 04-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 4218 : Part 3: 1999
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 4218 : Part 3: 1999


Classification Details
Group : Building Materials including Paints
Sub Group : Fasteners and hardware
Sub Sub Group : Fastners
Aspects : Others
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 724 : 2023
Organization Type: ISO

Sl.No. Synosis Points
1 This Indian Standard specifies the basic dimensions of ISO general purpose metric screw threads according to IS 4218 (Part 2). The values refer to the design profiles according to IS 4218 (Part 1). This document is applicable to the metric fastening screw threads.
2 The major changes in this revision are as follows: a) The scope of the standard has been revised to replace “basic profile” with “design profile” and a second paragraph has been included; b) Three symbols, d3, h1 and h3, have been added in clause 4; and c) The values and formula for the minor diameter of external thread, d3, have been added in Table 1 and clause 5.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-08-2024 28-01-2025 12-04-2025 27-08-2025 Mr. MONARCH JOSHI 28-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-04-2024 -------
2 P-Draft Waived 24-09-2024 -------
3 WC Draft 25-09-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Approval for wide circulation has been taken on e-office Submitted for your kind approval please
-------
4 WC Draft 26-09-2024 WC approved by HOD
PGDC   -------