Document Details |
|||||||||||
Name of Department/Committee : | CED 43 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Document Number : | CED 43 ( 26424) | ||||||||||
Document Title [English] : | Design and Construction of Machine Foundations Code of Practice: Part 1 General Provisions Third Revision | ||||||||||
Document Title [Hindi] : | भारतीय मानक मसौदा मशीनों की नींव का डिजाइन एवं निर्माण — रीति संहिता: भाग 1 सामान्य प्रावधान ( तीसरा पुनरीक्षण ) | ||||||||||
Document Type : | Revision | ||||||||||
Language : | English | ||||||||||
Priority : | 3 | ||||||||||
ICS Code : | 93.020 | ||||||||||
Date of Project Approval : | 22-06-2024 | ||||||||||
Standards to be Revised : |
|
||||||||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Soil Mechanics and Ground Improvement |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The various parts of the code have been restructured and the parts are now divided foundation-wise rather than machine-wise, except the part covering foundations for impact and impulsive load machines, that is, hammers and presses, where the foundation has to be necessarily machine-wise. | |
2 | This standard (Part 1) deals with general provisions applicable to all other parts covering foundations for various types of machines. These general provisions broadly cover general terminology, machine types, foundation types, machine parameters for both static and dynamic load data, geotechnical data (dynamic soil/ pile parameters), design load data, load combinations, general construction requirements, permissible vibration amplitudes, observations after commissioning of the machines, etc. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-06-2024 | ------- | ||
2 | P-Draft Waived | 27-08-2024 | ------- | ||
3 | WC Draft | 27-08-2024 | Duration : 31 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 27-08-2024 | WC approved by HOD |
CEDC CED 46 : P5, | ------- |