Document Details |
|||||
Name of Department/Committee : | CED 43 | ||||
---|---|---|---|---|---|
Document Number : | CED 43 ( 26411) | ||||
Document Title [English] : | Design and Construction of Foundations for Transmission Line Towers and Poles — Code of Practice (Second revision of IS 4091) | ||||
Document Title [Hindi] : | प्रेषण लाइन टावरों एवं खंभों की नीवों की डिजाइन और निर्माण — रीति संहिता (आईएस 4091 का दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.240, 93.020 | ||||
Date of Project Approval : | 22-06-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Soil Mechanics and Ground Improvement |
Aspects : | Code of Practice |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Transmission line towers and poles are subjected to large horizontal forces at the top, thereby causing overturning and/or uplifting of foundation. The design of foundations for such structures involves special problems and this standard has been prepared with a view to providing guidance to the designer. Often well foundations are used in river beds for which the concerned IRC standard may be referred. | |
2 | The provisions on necessary information to be provided for design and construction of foundations for transmission line towers and poles have been modified. | |
3 | Provisions on footings with and without under-cut have been modified. A 30° angle of cone assumption for determining soil resistance to uplift in case of footing has been specified for all soil types. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-06-2024 | ------- | ||
2 | P-Draft Waived | 23-08-2024 | ------- | ||
3 | WC Draft | 23-08-2024 | Duration : 35 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 23-08-2024 | WC approved by HOD |
CEDC CED 07, | ------- |